Company No. 516901447
A bench at the port, not a slogan on a van.
Haifa Pipe started in 2007 because the city already had enough people who would “look at it on Tuesday.” We take blocked stacks, bursting pipes, and boiler swaps from a workshop on HaNamal Street — and we go home when the joint is dry.
2007
We opened with a threader, a torch, and a stubborn city.
Haifa’s older fabric is stacks, plaster, and heaters on roofs. The work has not become “smart.” It has become more hidden. We still cut metal. We still sweat copper. We still tell you when a cheap fitting will fail in a year.
The shop
7 HaNamal Street is a bench, not a showroom.
You can collect a valve. You cannot browse a lifestyle wall. Copper coils, PEX, isolation cocks, heater connectors, and the camera live here. If we are on a job, the phone still hits the desk — leave a street and a symptom.
Postal code 3303128. Company number 516901447. We are not a franchise stencil. The same people who answer also cut the pipe.
Port edge
The street is HaNamal. The work is uphill.
Hadar is a short run. Carmel is a climb with parking that argues. The Kiryat is a different rhythm — houses, yards, heaters that stand in weather. We know which access cupboards actually open and which “shafts” are painted shut.
We do not claim the whole north of the country. If you call from outside Haifa, say the town first. Some jobs we take. Some we send you to someone closer.
What we refuse
We will not acid a shared stack or guess a leak.
- No chemical “openers” poured into a building riser that serves neighbours. If the stack is blocked, we open it as a pipe, not as a science experiment.
- No silent wall. If we cannot find the burst, we say so and we isolate. We do not tile over a maybe.
- No Saturday boiler fashion. Saturday is closed except bursts. A planned heater swap waits for Sunday unless water is leaving the system.
- No quote from a photo of a wet sock. Send a picture of the pipe, the heater badge, or the pool on the floor. Then we talk time.
Kit
The van is stocked like a short warehouse.
We do not drive to a merchant mid-job if the fitting is a standard isolation cock, a 15 mm coupler, or a heater union. Odd European leftovers may still mean a run to the trade counter — we say that on the phone.
Call-out load
Rods, jet hose, camera, copper, PEX, valves, heater connectors, drip trays. Two people when a riser is shared.
Leave from HaNamal
Copper bench
We still sweat. Heat and visible runs stay metal unless you ask for a hidden manifold and we agree it belongs there.
Cut · clean · flux
Manifolds
Text-only on purpose. PEX lives in the chase. We transition with fittings made for the job, not with hope and thread tape.
Domestic · hidden
Isolate first
If you can reach the cock, turn it. We would rather arrive to a dry burst than a ceiling that has been raining for an hour of traffic.
Cock · drain-down
Stacks we live with
Hadar backups are often the floor above, not your sink trap. We say that before we pull the first U-bend so you are not surprised.
Access before holes
Evenings
The phone still rings after 18:00. The shop door does not.
Emergency evenings by phone. If it is a burst, we talk isolation and whether the van rolls. If it is a lukewarm shower, we book Sunday. Saturday stays shut unless water is leaving the pipe.
+972 4 862 1190