Skip to the job book
Haifa Pipe van arriving on a Haifa call-out
Van · call-out

Job book

We log the pipe, not a five-star paragraph.

These are typical tickets from the HaNamal desk: a stack that would not take paper, copper that opened behind plaster, a heater union that wept on a Kiryat stand. Names stay off the page. The work does not.

Hadar risers Carmel chases Kiryat yards

Hadar

Third-floor backup. The trap was innocent.

Stack access opened on a Hadar blockage job
Stack · Hadar

Kitchen slow at night, bath on the floor above holding water in the morning. We skipped the U-bend lecture and opened the shaft. Wipes and grease at the bend. Rodded, flushed, camera to confirm the run was round again.

Building committee got the sentence: the riser is shared, the wipes are a building habit, not one flat’s “mystery.” We left the access usable, not painted shut.

Carmel

Wet ceiling. Pinhole in a long copper run.

Slope house, plaster bloom, water still moving. Occupant had not found the cock. We isolated at the meter side of the flat, opened a short chase, cut out the pinhole, sweated a copper repair, pressured the joint, and left the hole honest for the plasterer.

Parking took longer than the solder. That is Carmel. We still billed the pipe, not the hill.

Carmel street typical of a slope burst call-out
Slope · Carmel

Kiryat

Eighty litres. The union let go, not the element.

Yard water heater stand after a union repair in the Kiryat
Stand · Kiryat

Yard cylinder, salt air, drip tray half rust. The call said “heater dead.” The heater was fine. The union was weeping into the tray and the tray was weeping into the yard. New union, new tray, isolation cock that actually shuts.

It was a Friday morning. We finished before 13:00. A full swap would have been Sunday. We do not sell a cylinder when a fitting will do.

Port

Warehouse feed. Copper reroute off a crushed length.

JobDN 28
Copper reroute prepared for a port warehouse feed

Reroute, not a patch

A forklift kiss had ovalled a run along a low wall. We cut back to round pipe, offset with copper, clipped it where a pallet cannot reach, and tested. Galvanised leftovers on the same wall were left alone — they were not the leak.

HaNamal side of town

JobNote

Text-only spec

Commercial hours still follow the bench: Sun–Thu to 18:00, Friday to 13:00. A warehouse burst after that is a phone call and an isolation plan, same as a flat.

Same desk number

Isolation

The cock that had not moved since the last paint.

Seized isolation cock replaced on a Haifa riser
Cock · replaced

Hadar cupboard, painted handle, occupant sure “it does not do anything.” It did — once we stopped treating it as decoration. The old cock crumbled. New isolation, labelled, tested against the riser so the floor above kept water.

This is the unglamorous half of burst work. If you cannot shut the line, every pinhole becomes a flood. We would rather replace a cock on a quiet Tuesday than chase plaster on a Saturday.

How we quote

Street, symptom, access. Then a number.

We do not price a “full bathroom” from this page. We price a line we can see or a heater we can name. The form below does not send itself — it reminds you to call or mail the desk.

Describe the wet thing

Stack, burst, or heater. Street and floor. Whether the cock still turns.

AfterCrew
Crew after closing a job, kit returning to the van

What we leave behind

Dry joint, named material, access that still opens. Offcuts in the van, not in your stairwell. If a plasterer must follow, we say so before we pack.

No silent maybes

Haifa Pipe bench where jobs are prepped and logged
Logged at the bench

Next ticket

Your street can be the next line in the book.

Call +972 4 862 1190 while the floor is still only damp. Write desk@haifapipe.pro if it can wait until morning. Saturday stays shut unless the pipe is open.

Desk on HaNamal